Benefit-Cost Ratio

From CharityScorecard

(Redirected from BCR)
Jump to: navigation, search
Benefit-Cost Ratio (BCR) 
Once a CBA is done, the resulting BCR is calculated as the total benefits divided by the total costs. The BCR will be a unitless number, like "0.26", or "4.25". The bigger the BCR, the more cost-effective the project is. If the BCR is greater than 1.0, then the benefits outweigh the costs, and the project is cost-effective. If the BCR is less than one, then the costs outweigh the benefits, and the project is not cost-effective.